Concrete curing material

Cure 100 is a kind of protecting membrane for protecting water evaporation from concret and new mortar based on hydrocarbone resines that after operation on new concret surface in a short time dries and forms an unpermeable surface. Hence, the existing water in concret is trapped and the internal moisture remains. this action removes the need for curing with moisture method and hydration will be done as well.

application

“Cure100 has various applications, such as:

Maintenance and operation of various concrete structures
Concrete processing in areas with strong winds
Restrictions on spraying and keeping the concrete moist
concrete flooring with large surfaces such as industrial salons
Concrete curing in tropical areas exposed to direct sunlight

advantages

Reduction of concrete surface permeability
No need for continuous concrete spraying
Preventing creep and shrinkage of concrete
Preventing concrete surface from scaling
Reduction of shrinkage cracks in concrete surface
Moisture retention to maintain the hydration reaction
Creating a membrane on the entire concrete surface and preventing rapid evaporation of water
Facil, high speed and high accuracy of processing operations compared to spraying

packaging

Cure100 is available in 30 kg gallons.

Typical properties

physical state: liquid
color: light grey
special weight @ 25°C : 1.44 kg/L
chloride ion: no
* The mentioned data are obtained based on the latest controlled laboratory tests.

application guidline

Depending on the amount of moisture, wind speed and intensity, and ambient temperature, the amount of consumption is about 150 to 200 grams per square meter.

mixing

This product does not require any dilution and is ready to use, but it is better to mix well prior to use for homogenization. The curing operation should begin immediately after opening the moulds and when the concrete surface lost its moisture. The curing agent can be sprayed in a continuous layer on the sections,or it can be applied by brushing or spreading with a tee on the entire surface.
“Tip 1: Be careful not to perform curing in case of water leakage.

Note 2: In case of delay in curing operations, the concrete surface should be sprayed and saturated first and then processing should be performed.

storage and shelf life

Cure 100 is maintaned in closed packaging and away from direct rays of sun and ice situation.
in the case of above situation, the useful life of the product is 12 months from the date of production.

health and safety

there is not need for special actions but for observing safty actions, it is better to use protection gloves and eye glasses. In case of direct contact with skin or eyes, rinse immediately with water and see a doctor.
Please refer to the Safety Data Sheet (MSDS).

متن سربرگ خود را وارد کنید

برای تغییر این متن بر روی دکمه ویرایش کلیک کنید. لورم ایپسوم متن ساختگی با تولید سادگی نامفهوم از صنعت چاپ و با استفاده از طراحان گرافیک است.

Scroll to Top